Prepare a condo renovation information pack

Bring the proposed scope and the building’s process together before arranging work.

In this guide

Ask management for the process

Obtain the building’s renovation requirements, relevant governing documents and submission route. The Condominium Authority of Ontario explains that common elements can include shared infrastructure and that changes may need board approval. Ask management how that applies to the proposed area.

Describe the proposed removal

Include a room plan, removal and retention list, and any drawings available from the renovation team. Identify unresolved structural, service or material questions. Do not present an incomplete sketch as an approved construction instruction.

A room with retained wall and ceiling finishes.
A room with retained wall and ceiling finishes.
A large interior with timber wall and roof framing exposed.
A large interior with timber wall and roof framing exposed.

Keep permission and logistics separate

A service elevator booking does not by itself approve the renovation. Track permission, contractor documentation, access bookings and service coordination as separate items. Ask who confirms each is complete.

Send only what is needed

Provide documents through the building’s designated process and avoid unnecessary personal information. Once the project is ready for assessment, give Otter the city, unit type, proposed removal and status of management coordination.

Useful official information

Condominium Authority of Ontario: common elements
The corporation governs common elements; ask about approval before changes.

Sources reviewed 1 November 2026. Confirm the requirements for your actual property and scope.