Burlington, OntarioOpen 24/7 289-670-5241

Demolition in Burlington

I am renovating a condo

Bring the building requirements into the discussion before agreeing access or a demolition start.

In this page

Collect the governing information

Ask management for the renovation process, applicable rules and how they define unit and common-element boundaries. An interior location does not by itself establish that an item belongs solely to the owner. The Condominium Authority of Ontario explains that changes to common elements can require board approval.

A room with retained wall and ceiling finishes.
A room with retained wall and ceiling finishes.

Coordinate shared access

Find out how deliveries, elevator use and loading are arranged. Ask which documents must be provided and who confirms that a booking is ready. Keep those logistics separate from the actual permission to alter the unit.

Identify service dependencies

Shared plumbing, ventilation, alarms and electrical systems may need coordination beyond the unit. Give the relevant trades and management a clear description of proposed work. Do not assume turning something off in the unit isolates a shared system.

Send a simple enquiry

Include the city, floor, proposed room or finish removal and the building process you have received. A short description with Not sure where necessary is enough to begin the conversation.

A finished wall with vertical panels beside a window.
A finished wall with vertical panels beside a window.

Not sure what to call the work?

Tell us what you want to change and what you want to keep.
We can start there.