Describe the retained spaces
Tell the project lead which rooms, contents and access routes remain. Include neighbouring occupied areas and shared building systems if known. The arrangement should be assessed for the actual property, materials and scope.
Ask for the proposed approach
Ask how the work area and route will be managed, what preparation is expected from the owner and who is responsible for each measure. This site does not claim that a specific control method is used on every Otter job.
Keep material assessment separate
General dust discussions do not resolve whether a material needs specialist assessment or handling. Do not treat a mask, sheet or ordinary cleanup arrangement as permission to disturb an unknown material. Raise the uncertainty before removal.
Clarify the handover
Ask what the agreed cleanup includes and what the next trade or owner needs to arrange. Avoid using dust-free or ready to live in as a substitute for a defined end condition. Revisit separation and occupancy if the work scope changes.




