List the routines the room supports
Food storage, meal preparation, washing up and access to drinking water may all depend on the kitchen. Decide which routines can move elsewhere and which require a different arrangement. Keep food and utensils outside the work and debris routes.
Discuss access instead of assuming it
Ask the project lead which parts of the home can be used during the work and how services will be affected. A room outside the removal boundary may still be on the access route. Do not plan to cross a work area for essential supplies.
Avoid improvised service changes
A temporary household arrangement should not require unassessed electrical, gas or plumbing changes. Ask the appropriate trade about the equipment and connections you intend to use. Do not treat a demolition plan as approval for temporary installations.
Prepare for a change in arrangements
Keep the people involved aware of any access or household needs that could alter the plan. If the work boundary or service requirements change, review the temporary arrangement before continuing to rely on it. Occupancy suitability needs a project-specific decision.



