Burlington, OntarioOpen 24/7 289-670-5241

Demolition in Burlington

I am planning a new kitchen

Start with your kitchen layout and the things you want to keep. The removal list comes next.

In this page

Decide the layout before the removal list

If the sink, cooking area or cabinets are moving, mark the proposed positions on a simple sketch. If the layout is staying, list the finishes and fittings being changed. This helps distinguish a refresh from a wider strip-out without requiring you to know the construction terms.

Kitchen cabinets and an appliance beside a partly cleared floor.
Kitchen cabinets and an appliance beside a partly cleared floor.

Make a keep list

Appliances, floors and adjacent cabinets should appear on a separate list. Say where retained items will be stored and who will disconnect or move them. Reuse is an intention to assess, not a guarantee that every fixed item can be recovered.

Plan the household routine

Think through food storage, access to water and a temporary place for essentials. Ask the project lead which areas can be used during each stage before committing to staying in the house. Share access restrictions and the details of the next installer.

Your next useful step

Read the kitchen scope page, make a short removal and retention list, then contact Otter with the city and broad plan. You can leave dates and technical details undecided.

An open kitchen and living area with the ceiling exposed.
An open kitchen and living area with the ceiling exposed.

Not sure what to call the work?

Tell us what you want to change and what you want to keep.
We can start there.