A kitchen is a collection of connected pieces
Cabinets, counters, backsplashes, flooring and services meet each other in ways that are not always visible. Decide whether the new kitchen keeps its layout before describing the removal. A cabinet-only change has a different boundary from a room stripped for a new layout. Kitchen removal and kitchen strip-out are covered here together.

Identify what stays
Tell us about appliances to reuse, flooring that continues into another room, retained ceiling finishes and any cabinet sections that remain. Reuse intentions should be agreed before dismantling. Existing condition, fixings and the way pieces join can affect whether an item can be recovered intact.
Keep disconnections and rebuilding explicit
Plumbing, electrical and gas work are separate responsibilities. Identify the appropriate trades and the status of their work; a photograph is not confirmation that a line is isolated. New cabinetry, wall repair, flooring preparation and installation should have their own handover requirements.
- A whole-room view and a rough new layout.
- A list of retained appliances and finishes.
- Access route, property type and general location.
Prepare before an agreed start
Empty cupboards and drawers once the work arrangements are confirmed. Make a separate plan for food, small appliances and household routines. Do not remove fixed fittings or disturb suspect layers to help prepare. Ask what needs to be ready and who verifies it.
Cabinet removal or a wider strip-out?
A cabinet-focused enquiry can keep the room layout and floor in place, subject to assessment of the connected edges. A wider strip-out can involve wall and ceiling finishes as well as fittings. List each surface separately, especially the backsplash and floor below cabinets. If you are keeping a countertop, explain that intention before assuming the cabinets beneath it can be removed independently.



