List the systems involved
Identify known electrical, plumbing, gas, heating and other services in or near the proposed work. Use existing plans and visible information. Do not open panels or pull out fittings to trace a service for the enquiry. Unknown connections should remain questions for assessment.
Assign isolation and verification
Ask who determines the service work required, who carries it out and how readiness is confirmed. An appliance switched off or an unused pipe is not proof that the relevant service has been made ready for demolition.
Use the applicable process
Electrical Safety Authority guidance describes electrical notification and inspection responsibilities. Burlington also publishes a service-disconnect checklist for proposed demolition. Those sources apply to their respective scope; a general removal discussion cannot replace the required trade or utility process.
Record dependencies before arranging work
Keep the relevant confirmation with the current scope and identify who communicates a change. If removal exposes a service that was not in the plan, the next step needs assessment. Do not assume the original arrangement covers a newly discovered connection.
Useful official information
Electrical Safety Authority: notifications and inspections
Electrical work has its own notification and inspection process.
City of Burlington: demolition service disconnect checklist
City checklist identifies authorities to contact for proposed demolition.
Sources reviewed 1 November 2026. Confirm the requirements for your actual property and scope.