Make a room-by-room boundary
Use the renovation plan to list proposed removal for each room. Include retained doors, stairs, framing and services. Avoid relying on a phrase such as gut everything because different people can interpret it differently.

Bring dependencies into one sequence
The project lead should identify approvals, material assessments and service work before demolition is arranged. Record who owns each step. The removal stage cannot substitute for engineering, regulated trade work or the design of the replacement space.
Agree how discoveries are handled
Choose the person authorised to make decisions and the information they need if the agreed boundary changes. Ask what causes work to pause and how a revised scope will be recorded. Do not treat silence as approval for additional removal.
Prepare for the handover
Ask the next contractor to define the required exposed condition, retained components and inspection points. Share those requirements with the removal enquiry, together with general location and access information.