Ask for the required condition
Request a description from the installer of what they need after removal. It should distinguish exposed finish, remaining adhesive, underlay and substrate condition where relevant. A general phrase such as ready for flooring can mean different things to different trades.
Allocate preparation tasks
Record who assesses moisture, repairs damaged substrate, levels the surface and prepares transitions. Those tasks may sit with a different contractor. Do not treat them as included simply because the previous floor is being removed.
Identify a review point
Ask whether the installer needs to inspect the exposed floor before additional preparation proceeds. Make room for that assessment in the project sequence without assuming a fixed duration. The removal team should know who can authorise a changed end point.
Document unresolved items
At handover, record the removal completed, areas retained and any conditions awaiting assessment. Share photographs through the agreed project channel. A tidy appearance alone does not establish that the substrate meets the requirements of the new floor.
Turn ready for flooring into four answers
Ask the installer to record the intended exposed layer, the condition they will inspect, the preparation they will perform and who approves extra removal. This creates a usable handover even when adhesive or substrate condition is still unknown. A statement such as remove the finish, leave substrate repair for installer review is a hypothetical scope note, not a specification for your floor.