Start with the handback requirement
An office, retail unit or other commercial interior should be assessed against the proposed lease handback or renovation drawings. A request for an empty unit is too broad when fixtures, partitions and building systems have different owners. Ask the landlord or project lead for the intended end condition.

Separate fit-out from base building
Identify furniture, finishes, partitions, signage and fittings in the proposed scope. Keep fire systems, shared services, structural elements and landlord assets outside assumptions. Their treatment needs the relevant approvals and trades. Photographs of exposed ceiling services are not evidence that those services were removed.
Coordinate the building
Provide loading arrangements, permitted access, management contact process and any neighbouring occupied areas. Work-hour rules and service interruptions should be confirmed for that building. Open 24/7 contact availability does not override building restrictions.
Make the enquiry manageable
A first message can include the unit type, city, floor, broad removal list and the document that defines the handback. You can state Not sure about details. Food-service equipment, specialist systems and material remediation need separate evidence and assessment.
- Who is authorised to approve the scope?
- What remains for the next tenant or contractor?
- Which inspections or handover records are required?
Bring a scope schedule
A short schedule can list each area, the tenant finish proposed for removal, the item that stays and the person who approves it. Keep unanswered ownership questions visible. That record is particularly useful when the landlord, tenant and following contractor use different meanings for an empty unit.




