Find the controlling document
Ask the landlord or project lead for written handback requirements and relevant drawings. An empty-looking space may still contain fixtures or systems that must remain. Resolve who is authorised to approve the removal list before requesting a final scope.

Identify neighbouring operations
Explain whether adjoining units or shared corridors remain occupied. Ask management about permitted hours, loading arrangements and any coordinated service interruptions. A building booking and a demolition agreement solve different parts of the project.
Record what is excluded
Separate specialist equipment, regulated trade work, hazardous materials and structural changes from general interior removal. If an item is unclear, photograph it from a safe position and identify the uncertainty rather than assigning it to demolition by default.
Start with a short message
The first enquiry can give the city, type of unit, access level and intended end condition. Add the status of landlord approval and the contact process for the project lead.