Burlington, OntarioOpen 24/7 289-670-5241

Demolition in Burlington

I am replacing the flooring

Connect the removal boundary to the new floor, including thresholds and rooms you are keeping.

In this page

Start with the new floor requirements

Ask your installer whether they need only the finish removed or additional preparation. Write down who handles adhesive, underlay, levelling and repairs. The first removal enquiry should not treat all those tasks as one unspecified job.

A small room with floor finish removed and debris around its edges.
A small room with floor finish removed and debris around its edges.

Identify connected surfaces

Record where the finish continues under cabinets, across doorways or onto stairs. Explain which sections remain. Existing transitions can help describe the proposed scope but do not prove where hidden layers end.

Plan where contents will go

List bulky furniture and storage needs. Keep the intended access route separate from the work area. Confirm who moves what before an agreed start instead of discovering an immovable item when the space is needed.

Leave unknown materials alone

Do not lift tiles or scrape adhesives to identify them for an enquiry. Existing reports and visible information can be shared. Materials that need assessment should be resolved before disturbance.

A narrow hallway with flooring and doors still in place.
A narrow hallway with flooring and doors still in place.

Not sure what to call the work?

Tell us what you want to change and what you want to keep.
We can start there.