Start with the new floor requirements
Ask your installer whether they need only the finish removed or additional preparation. Write down who handles adhesive, underlay, levelling and repairs. The first removal enquiry should not treat all those tasks as one unspecified job.

Identify connected surfaces
Record where the finish continues under cabinets, across doorways or onto stairs. Explain which sections remain. Existing transitions can help describe the proposed scope but do not prove where hidden layers end.
Plan where contents will go
List bulky furniture and storage needs. Keep the intended access route separate from the work area. Confirm who moves what before an agreed start instead of discovering an immovable item when the space is needed.
Leave unknown materials alone
Do not lift tiles or scrape adhesives to identify them for an enquiry. Existing reports and visible information can be shared. Materials that need assessment should be resolved before disturbance.




